İ.T.U. Campus, Faculty Buildings
Employer | : | T.R. İSTANBUL PUBLIC WORKS AND SETTLEMENT DIRECTORATE |
Location | : | İTÜ Maslak Kampüsü/Ayazağa/İstanbul |
Definition of the project | : | It is a construction consisting of the buildings of Mining Faculty, Faculty of Naval Architecture and Ocean Engineering, with a total closed area of 32.000 m². It was built with classical method and various blocks were connected to each other with joints. |
Excavation | : | 125.000 m³ |
Reinforcing Bar | : | 2.100 ton |
Reinforced Concrete | : | 25.000 m³ |
Formwork | : | 115.000 m² |
Wood Joinery | : | 1.600 m² |
Aluminum Joinery | : | 55 ton |
Stellwork | : | 65 ton |
Aluminum Roof Coating | : | 14.500 m² |
Terrazzo Tile Floor Coating | : | 33.000 m² |
Plastering | : | 160.000 m² |
Construction Type | : | Conventional |