Municipality Bus Garage / Ayazağa

Employer : I.E.T.T OPERATIONS GENERAL DIRECTORATE OF T. R. ISTANBUL METROPOLITAN MUNICIPALITY
Location : Ayazağa/İstanbul
Definition of the project : The construction of Ayazağa bus garage of stage 3 and 4 I.E.T.T Operations General Directorate of T. R. Istanbul Metropolitan Municipality is a project on a 110.000 m² area where 700 municipal buses will use as open garage ² with over a closed area of 11.000 m² consisting of the maintenance workshops of the buses, administration building, exhibition center buildings and was completed in 20 months.
Main Figures
Excavation : 22.000 m³
Mechanical Filling : 26.000 m³
Reinforcing Bar : 1.018 tons
Concrete : 6.000 m³