Municipality Bus Garage / Ayazağa
Employer | : | I.E.T.T OPERATIONS GENERAL DIRECTORATE OF T. R. ISTANBUL METROPOLITAN MUNICIPALITY |
Location | : | Ayazağa/İstanbul |
Definition of the project | : | The construction of Ayazağa bus garage of stage 3 and 4 I.E.T.T Operations General Directorate of T. R. Istanbul Metropolitan Municipality is a project on a 110.000 m² area where 700 municipal buses will use as open garage ² with over a closed area of 11.000 m² consisting of the maintenance workshops of the buses, administration building, exhibition center buildings and was completed in 20 months. |
Excavation | : | 22.000 m³ |
Mechanical Filling | : | 26.000 m³ |
Reinforcing Bar | : | 1.018 tons |
Concrete | : | 6.000 m³ |